Pressure Calibration for Series III Pump (Serial numbers A19999 and lower)
- Connect the pump’s inlet port to the solvent bottle using an inlet line and filter.
- Connect a Multimeter to the pressure board with the black lead on TP3 and the red lead on TP5.
- Connect the pump’s outlet port to the Digital Pressure Gauge and shut-off valve.
- Apply power to pump and verify that the Lower Pressure Limit is 0 PSI and the Upper Pressure Limit is at 5000 PSI. If they are not at these values, change them.
- Prime the pump at its Prime/ Purge Valve with the syringe.
- Close the Prime/Purge Valve and open the shut-off valve. Run the pump for a few minutes to prime gauge/valve line.
- With the pump stopped and the Prime/Purge Valve Open and the pump at atmospheric pressure, adjust the P-ZERO trimpot until the Multimeter reads approximately 0.000 volts.
- Close the both the Prime/Purge Valve and the shut-off valve and run the pump at 2.50 ml/min.
- Wait for the pump to built pressure and trigger the Upper Pressure Limit. The pressure should stabilize and drop slowly. If the pressure continues to drop quickly, check for leaks.
- Adjust the P-SPAN trimpot until the pressure displayed on the pump’s front panel equals the pressure displayed on the pressure gauge.
- Vent the pump to atmospheric pressure by slowly opening the Prime/Purge Valve. (A rapid release of pressure will damage the Pulse Damper or Pressure Transducer.)
- Adjust the P-ZERO trimpot if necessary to obtain 0.000 volts. Note: The syringe must be removed from the Prime/Purge Valve to obtain an accurate zero.
- Press the Run/Stop button or Mode button to cancel the pressure fault.
- Repeat steps 7 through 13 until no adjustment is required at step 12.
Click here to download the Pressure Calibration for Series III Pump service document